Status: done (2026-11-17) Priority: 3 Size: S Arch: far Phase: implement Design ref: VB-784; design.md, Moving to new land (The booth) Goal: Every way a booth’s wood comes is tested. Acceptance criteria:
timber trip from the village wood within WOOD.reach, 2 loads lie at the booth’s tile, then the raising takes 12 hours. Add it to tests/booth.js (VB-784 tests only the wooded-tile path).Noted by VB-784, 17 November 2026.
scenario("founders", 7) (small island, forest): open tile 3..6 from the house, unwooded, within WOOD.reach of the village wood; staked, wood fetched (>= 2 loads at the tile), then raised 12 hours later. Passes; no defect found in the fetched path.