village-builder

VB-862: Tests: verify’s total CPU under four minutes, and no script over 5 s

Status: done (2026-11-22) Priority: 2 Size: M Design ref: docs/testing.md; backlog/VB-856.md Goal: Verify runs in about a minute on four cores, so that a task can run it after every change Acceptance criteria:

Opened by the orchestrator, 17 November 2026, for the criterion VB-856 left unticked (verify under a minute).

Notes: