village-builder

VB-818: Wrap-up: roads, boats and ice

Status: blocked Waits for: VB-809, VB-810, VB-811, VB-812, VB-813, VB-814, VB-815, VB-817, VB-115 Priority: 3 Size: S Arch: roads Phase: wrap-up Design ref: docs/slices.md, section 3.10; design.md, Climate and travel beyond walking; docs/plans/VB-190.md, sections 6 and 8 Goal: Slice 10 is closed with its measures: cost against its claim, the loops’ bands, and what Kim should know of how the island changed. Acceptance criteria:

Noted by VB-190, 16 November 2026.