Status: blocked Waits for: VB-809, VB-810, VB-811, VB-812, VB-813, VB-814, VB-815, VB-817, VB-115 Priority: 3 Size: S Arch: roads Phase: wrap-up Design ref: docs/slices.md, section 3.10; design.md, Climate and travel beyond walking; docs/plans/VB-190.md, sections 6 and 8 Goal: Slice 10 is closed with its measures: cost against its claim, the loops’ bands, and what Kim should know of how the island changed. Acceptance criteria:
medium-ref and small-y40 (owed to the night where the machine is shared): the slice’s share of a game day against its claim of 4 ms on the middle world, the far north reported beside it; the land table, the winter table and the table by boat, a row and the whole; the longest step on a winter date; save and load. The slice’s systems join tools/bench.js’s shares.tests/lib/bands.js: a report for the full runs (the share of loads by mode; journeys by water and over ice a year; ways built and kept; days of open water, snow and bearing ice) and an assert on a reduced run where one can show the loop (a lake that bears joins two shores; a boat left away is not at home).docs/plans/VB-189.md, section 9): how the regions’ and market potential’s reports read by mode and season, and the people in reach against the second mock’s figures, with VB-776’s result if it has run.docs/architecture/modules.md and ownership.md; design.md’s statuses for what was built; a row of docs/design-changelog.md.Noted by VB-190, 16 November 2026.
medium-ref the cost of a winter’s date (a band’s rows recompiled: sim/walking setRows, at most 6 dates a band a year) and of the winter table (sim/villagehours winterStep: a row a step, the ground of a normal winter compiled afresh for each row, a search bounded at 24 hours); if over the slice’s line, the bound falls to 12 hours.