village-builder

VB-817: The right of way: a built way across others’ holdings is granted by the village and agreed by each holder

Status: blocked Waits for: VB-815 Priority: 3 Size: S Arch: roads Phase: implement Design ref: design.md, Climate and travel beyond walking (Passage); Land, ecology and rights, Land and rights (Passage; Slice 5’s rights: pass with built ways); docs/architecture/target-v2.md, section 4.3 (grant, via); docs/plans/VB-190.md, section 5.5 Goal: Kim’s decision 22 (3 Nov): the village grants passage for its land; every other holder must agree. A built way holds the rights it crosses. Acceptance criteria:

Noted by VB-190, 16 November 2026.