Status: blocked
Waits for: VB-815
Priority: 3
Size: S
Arch: roads
Phase: implement
Design ref: design.md, Climate and travel beyond walking (Passage); Land, ecology and rights, Land and rights (Passage; Slice 5’s rights: pass with built ways); docs/architecture/target-v2.md, section 4.3 (grant, via); docs/plans/VB-190.md, section 5.5
Goal: Kim’s decision 22 (3 Nov): the village grants passage for its land; every other holder must agree. A built way holds the rights it crosses.
Acceptance criteria:
pass right in the land rights of VB-311, granted under the holder’s own: by the meeting’s vote for the village’s commons and outland; by a household’s head for its field, meadow or yard; by the other village’s meeting for its land. A facility that is a built way lists them (via), and is not begun until it holds one for every tile of its stretch.WAYS.strip 5% of a crossed field tile’s yield, a named tunable), plus what its goodwill and opinion of the asker allow (the allowance rule as it stands; a favour granted books goodwill as help does). The played head is asked as any head is, through the offers it already sees.Noted by VB-190, 16 November 2026.