Status: blocked Waits for: VB-812 Priority: 3 Size: M Arch: roads Phase: implement Design ref: design.md, Climate and travel beyond walking (Modes; Boats and landings); docs/plans/VB-190.md, section 5.4 Goal: Bulk goes by water (principle “Place matters”: trade over land, by river, and late by sea): a second kind of boat that makes a load between villages cheap, and rivers as ways inland. Acceptance criteria:
BOATS.large): crew 4 at the oars, 900 rations or 12 people beyond them, 0.35 a tile of water, on the sea within nearLarge 8 tiles of land (the small boat’s 3 leaves 40 to 42 pairs of villages apart at seeds 11 and 42: report how many 8 joins); 120 hours and 20 loads of timber at a landing, tarred as the fishing boat is (2 barrels). A head begins it as any project (VB-678), when its own count of loads that waited for a boat passes a named number; nobody is given one.gen/rivers kind River: 52 to 190 tiles a medium island) at river 0.5 a tile down and 0.75 up; a ford is a portage of portage 3; a bridge is passed. A village on such a river has a landing on it (the plan counted 3 to 4 more villages with a landing a map).nearLarge 8.Noted by VB-190, 16 November 2026.