village-builder

VB-765: Strata: the heads line, the work line and the sink’s report

Status: done (2026-11-19) Priority: 3 Size: S Arch: town Phase: implement Design ref: design.md, Balance loops and targets (Strata; The balance review: The urban sink); docs/plans/VB-189.md, sections 5.8 and 7 Goal: 600 / 325 / 75 is countable, both ways, before anything is built for it, and every village’s sink is reported (Kim, 16 Nov: counted by work, all craft hours counting, heads beside). Acceptance criteria:

Noted by VB-189, 16 November 2026.

Notes (VB-765)