village-builder

VB-721: Draining a wet field: a project a head may start

Status: done (2026-11-24) Priority: 3 Size: M Arch: roads Phase: implement Design ref: design.md, Goods and the farming year (Yield over time), Crops and the weather (Not yet in); docs/review-yields.md (section 2.5) Goal: Drainage is a land improvement a head decides on (Kim, 16 Nov: yes, later), built with slice 10 once a place has its wetness. Acceptance criteria: Blocked until slice 10’s plan (VB-190) has written the wetness of a place; that plan confirms, rewrites or closes this task. Kim, 16 November 2026: yes, later.

Noted by VB-160, 16 November 2026.

16 Nov 2026 (the plan of VB-190, docs/plans/VB-190.md, sections 5.1 and 8): confirmed. The wetness it waited for is w.hm; the seeds and maps for its numbers are populous small, seeds 7 and 42, 30 years, and founders small, seed 7, 50 years, on the middle world. It waits for nothing once VB-190 is done.

24 Nov 2026 (built; numbers at base 6247d85 and the branch’s head, small map; populous 30 years, founders 50):