Status: done (2026-11-16)
Priority: 3
Size: S
Arch: mill
Phase: plan
Design ref: AGENTS.md, Deciding without Kim (7, 9, 16); design.md, Goods, production and animals
Goal: For every generated deposit and rock: what it is made into, what uses that up, who needs it, and when it enters (which slice), written as tasks; none is left as map colour without a reason.
Acceptance criteria:
QUESTIONS.md.docs/plans/VB-702.md). Kim, in the session, on the draft’s eight choices: (1) the island’s own metals enter with the mill, slice 6’s second half, as goods of place; the bell’s church use and coin wait for the church and the Crown; this moves the decision of 11 Nov (metals with the ship). (2) Bronze is household goods and the bell: a copper kettle that wears, a cast bronze pot as dowry and heirloom, a village bell the meeting decides and the alderman carries out; iron first. (3) Tin doubled (0.25 to about 0.5) and in granite hills, so that bronze by land trade is possible on most maps (against the draft’s “keep it scarce”). (4) Silver before coin is a good of worth only: kept, given, worn, buried; at a swap at customary worth; barter until coin stands; the lost hoard is its sink. (5) Any household digs a found vein by hand, as clay, and owns the ore; a mine in shares later. (7) Gold as silver, at about ten times the worth. (6, 8) Answered by a principle, now AGENTS.md, Deciding without Kim, 17: a good is what it is for and is made of a class of material; the kind makes a better or worse one; quality is the kind’s physical properties, with no grade number; a whetstone is one good of slate (the keener) or sandstone, which is the only grindstone.{kind, made} record for a household’s durable, no record for each item, worth a row of custom’s table a kind; about 30 numbers a household. Decisions D1 to D18 with reasons are the plan’s section 9; the close calls are decision notes.design.md): World and scale (Ground: tin); Goods, recipes and facilities (the row A good, its material and its kind); The mill and the loom (the halves; Left for the ships, moved); the new subsection The metals and the stones; In the ground (What each is for; prospecting); What each good is for (six rows); Open questions (the quality of goods). docs/design-changelog.md; docs/roadmap.md 3.6 and 3.8.--report ground), all ready; blocked: VB-736 (mining), VB-737 (prospecting), VB-738 (the furnace), VB-739 (the kettle and the cast pot), VB-740 (the bell), VB-741 (things of worth), VB-742 (the hoard), VB-743 (whetstones and grindstones), VB-744 (soapstone pots, marble’s lime), VB-745 (the memorial stone, Proposed). Seven tuning rows, ten decision notes, one candidate (D5).question note; the plan’s section 11), so the task ends needs-review: whether a maker’s skill may also make a better good (proposed: rate only, as Decided), and whether a millstone may be granite, slower (proposed: sandstone only, as Decided).decision notes: graded are tools (their ironwork), whetstone, grindstone, quern, millstones, pot, kettle, cloth and dress, bell, memorial stone; not graded are materials (yarn among them), food and ale, the thing of worth (by weight: a close call against the orchestrator’s list) and what is built (houses, facilities, boats, carts); a farm’s tools have one grade, drawn when the set is forged; a grade scales life and working but not what a thing holds; a head keeps the best, owes in the least and gives for standing in the best; the five are called workmanship, since a house has a grade. One candidate: a grade belongs to a piece one maker finishes and a household keeps; a material, a food and a thing built have none.design.md): Goods, recipes and facilities (principle 17’s row); The mill and the loom (Skills and The mill, each marked moved); The metals and the stones (Quality; Workmanship and four rows more; Kind in state; Tin; Cost; the millstone’s kinds; the two tables under Workmanship); the hands trait; In the ground; Open questions. docs/design-changelog.md; docs/roadmap.md 3.6.tuning rows, nine decision notes, one candidate. An inbox note cannot be replaced, so the corrections to phase two’s notes (VB-734 tin only; VB-761 added to the waits of VB-739, VB-740, VB-743, VB-744 and VB-745; the question answered; a tuning cell) and the dated line for each task outside the plan (VB-360, VB-361, VB-364, VB-366, VB-362, VB-363, VB-121, VB-701, VB-093, VB-368 to VB-370, VB-698, VB-302, VB-276, VB-475, VB-416, VB-371) are the plan’s section 14, for the orchestrator after inbox apply.