VB-677: Teleport: tar, the commons’ sheaves and seed, and the lesser moves of the review
Status: done (2026-11-18)
Priority: 3
Size: M
Arch: physical
Phase: implement
Design ref: AGENTS.md, Deciding without Kim (the hard rule)
Goal: Each of these goods is where its work left it until someone carries it.
Acceptance criteria:
Each lead is confirmed or struck in the notes, with its line; the confirmed ones are mended by carrying (a load, a lying load) or split off as tasks of their own where one is size M.
A test for each mended; numbers before and after where food or wood moves.
16 Nov 2026: Found by the consistency review of 16 November 2026 (code only); the lines named are leads, to be confirmed before work starts.
18 Nov 2026 (Kim): closed as folded into VB-1175, the collected teleports; not built.