village-builder

VB-669: The head’s doubt on the supply outlook: a range, shown as a whisker

Status: done (2026-11-22) Priority: 2 Size: M Design ref: docs/mocks/supply-doubt.html; design.md section 7 (How a holder chooses: foresight; The estimate); AGENTS.md, Deciding without Kim, 14 Goal: What is ahead is the head’s estimate, a centre and a range: a poor head’s is wide, and the player sees it. Acceptance criteria:

Notes: