Status: done (2026-11-17) Priority: 3 Size: S Arch: year Phase: implement Design ref: design.md section 7, Holders and plans; backlog/VB-255.md Goal: No plan stays open with nothing posted and nothing waited for Acceptance criteria:
plot.to null: sim/expansion’s finishStep, sim/cottage’s finishCottage) does not stand open for ever: it is allotted at the next moving round to one then waiting, or after a stated time its tiles are released (owner, st.used, w.dev) with what was built on them accounted for (goal=no plan stays open with nothing posted and nothing waited for; ref=design.md section 7, Holders and plans; backlog/VB-255.md)Noted by VB-255, 16 November 2026.
sim/expansion reallot (run by startPlots at each moving round): a village’s plot with open >= 1, to === null is allotted afresh (allot, then
finishCottage if it was already roofed); else the first round stamps plot.vacant, and after VACANT_YEARS (2) years releasePlot gives the
ground back (owner null, st.used, w.dev 0, costChanged), and sim/plans drops the plan on event plotReleased. Cottage stages built and
the walls’ timber are left to the weather (told in the log).