village-builder

VB-478: Wrap-up: work as blocks

Status: ready Priority: 3 Size: S Design ref: docs/review-blocks.md; design.md section 7 (A leg, and its end, to The timetable); docs/mocks/blocks/README.md; docs/cost.md section 1 Goal: The change is measured against what the plan claimed, early and late. Acceptance criteria: