Status: ready Priority: 3 Size: S Design ref: docs/review-blocks.md; design.md section 7 (A leg, and its end, to The timetable); docs/mocks/blocks/README.md; docs/cost.md section 1 Goal: The change is measured against what the plan claimed, early and late. Acceptance criteria:
tools/bench.js at medium-y5 and medium-ref: the agents’ and the jobs’ lines against their shares, and no 6-minute step over 60 ms.tests/lib/bands.js: events a pawn-day, the share of tasks ending inside their head’s range, crops lost to frost by the head’s skill.docs/tuning.md for each shortfall outside the tasks’ reach.
Notes / questions:docs/review-blocks.md, section 4, step 9). Kim, 15 Nov: scheduled blocks, a breaking change allowed.