village-builder

VB-475: Time taken from causes: the crop’s size, the hand’s skill, mishaps

Status: done (2026-11-22) Priority: 2 Size: M Design ref: docs/review-blocks.md; design.md section 7 (A leg, and its end, to The timetable); docs/mocks/blocks/README.md; Long work and processing Goal: A task takes longer for reasons the world can show, and the only new randomness is small and has a cause. Acceptance criteria: