village-builder

VB-451: Refactor: split sim/routes by concern (walking costs and reach, the route cache, the hours between villages)

Status: done (2026-11-19) Priority: 3 Size: M Design ref: none (code structure). backlog/VB-413.md, VB-414, VB-415; docs/architecture/target-v2.md section 4 Goal: sim/routes went over its export baseline (18 over 17) with reachTiles (VB-452). It holds three concerns: what walking costs and where a pawn can stand (tileCost, passable, walkable, reachTiles, slopeFactor, stepCost), the route search and its cache, and the villages’ table of walking hours. Split it by concern, each move checked with tools/same.js; find each part’s owner in target-v2 section 4 first. Acceptance criteria: