VB-370: Parts of the house: walls of stone or brick in lime mortar
Status: blocked
Waits for: VB-369
Priority: 3
Size: M
Arch: mill
Phase: implement
Design ref: Goods, production and animals (The mill and the loom, the kiln and the quarry); backlog/VB-185.md
Goal: A third part of the house, after VB-369: mortared walls of stone or brick on a house with the stone foundation, a property kept as the others are; “stone house” becomes a label read from the parts (design.md, The houses, revised 27 Nov).
Acceptance criteria:
farmstead.walls (‘log’ default, ‘mortared’): on a house with grade ‘stone’, 40 loads of stone (any kind but slate) or of brick, 8 loads of lime, 160 work hours (BUILD.mortared); no mortar under timber walls is kept as a check. A village with no limestone gets its lime by exchange.
What it brings: the house wears 0.02 a year less and its term gains 0.07 (Proposed; the old stone house’s 0.04 against 0.06 and 0.32 against 0.25). Marble and soapstone add nothing yet (the church, slice 8).
Numbers (populous small and medium, seeds 7 and 42, 60 years): mortared houses built and when; lime moved between villages at the fair; whether a granite village ever builds one.
npm run verify passes its hard checks.
Notes:
27 Nov 2026 (Kim, buildings review thread): rewritten as a part of the house, not the fourth grade; the old numbers are kept as the part’s difference over the old fine house.
Numbers are Proposed by slice 6’s plan (11 Nov) on Kim’s answers to the shape; the hours are in the game’s work hours (576 an adult a year) and, but for the textile shares, from general reading not checked by search: each task reports its numbers and the wrap-up tunes them.
16 Nov 2026 (Kim’s answers after the plan of VB-702; section 14): Brick, tiles and lime are materials and a house is built: none is graded (the plan of VB-702, D20, D22). ‘Fine’ in ‘the fine timber house’ is a kind of house, not a grade of workmanship (D29).