village-builder

VB-325: Wrap-up: between villages: distance and journeys

Status: ready Priority: 3 Size: S Arch: between Phase: wrap-up Design ref: Between villages: distance and journeys (10 November); backlog/VB-281.md (survey); docs/slices.md, section 3.2 Goal: Check the between-villages arch against the design with long runs, report the numbers against VB-281’s survey (before), and name in docs/tuning.md the parameters a tuning run of Kim’s would move. Acceptance criteria: