village-builder

VB-304: Wrap-up: the gathering and the fair

Status: blocked Waits for: VB-296, VB-297, VB-298 Priority: 3 Size: S Arch: fair Phase: wrap-up Design ref: docs/slices.md, section 3.4; Settlements, The gathering (10 Nov); Exchange, The fair: barter between villages (10 Nov) Goal: Check slice 4 against the design with long runs, report the numbers, and name in docs/tuning.md the parameters a tuning run of Kim’s would move. Acceptance criteria: