village-builder

VB-278: The meetings a village a step: each village’s meeting in its own six-minute step

Status: done (2026-11-16) Priority: 2 Size: M Arch: between Phase: implement Design ref: Customs and culture (Meetings, culture and splits: A village’s meeting, Decided, 10 Nov). Survey and cost: backlog/VB-242.md. Goal: The year’s meetings (meetingStage, src/sim/lifecycle.js:60-89) run in four stages for the whole island from noon of autumn day 10 (VB-206). Stage 0 refreshes everyone’s roles, prestige and interests, stage 1 every settlement’s tie, stage 2 the entrepreneurs, every settlement’s meeting and every culture’s year, and stage 3 is the land meeting. Kim decided on 10 November that each village holds its own meeting in its own step, in the order of village id, and a lone farm is a village. VB-206’s stages become the stages of one village; then come the cultures’ reckoning and the land meeting, which are not any one village’s. Acceptance criteria: