village-builder

VB-263: Cost growth as targets: tests/scaling.js and tests/history.js report residuals

Status: done (2026-11-10) Priority: 2 Size: S Design ref: docs/gates.md; QUESTIONS.md, VB-261 Goal: VB-261 (docs/gates.md, rows 16, 17 and 19): the cost baseline’s ceilings were allowances written to keep a hard line green (PR 96 added oppAsk, planReview and cookFarm; recordFold was left failing). The lines stay; the ratchet goes. Acceptance criteria:

Implementation notes:

Validation (same local fixtures, stale, at acb5dcf):