village-builder

VB-1926: The head’s call is urgent or not: bring the load in, or drop everything

Status: done (2026-11-27) Priority: 2 Size: M Arch: plans Phase: implement Design ref: design.md, Plans at four scales (The head calls; The cut and the call; A load in hand); Principles for decisions; docs/plans/four-scales/README.md Touches: sim/day (call); sim/jobs (allot, slotIn); sim/reasons; page/play; tests/call.js Goal: A head’s call to a member is non-urgent by default (the member brings its load in, arrives within about an hour) or urgent (drops the load, comes now), and the panel names which and its cost before the call. Acceptance criteria: