village-builder

VB-190: Plan: roads, boats and ice (slice 10)

Status: done (2026-11-16) Priority: 3 Size: S Arch: roads Phase: plan Design ref: docs/slices.md, section 3.10; docs/architecture/target-v2.md, sections 4.2 (climate, movement modes, worn and built ways) and 4.3 (Facilities; passage) and trace 7.3; Kim’s decisions 16 and 22; World and scale; Weather, seasons and daylight. Goal: Ways of travel beyond walking: carts, sledges and boats; climate by latitude, with ice that carries traffic where it is cold enough; built ways as facilities, with passage rights and upkeep. Design it concretely and write slice 10’s tasks. Acceptance criteria: