village-builder

VB-1894: A planner who falls ill or is called away gives its authored steps back to the household’s day at once

Status: done (2026-11-27) Priority: 3 Size: S Arch: plans Phase: implement Design ref: design.md section 7, Plans at four scales (Authors: a step whose holder cannot work returns to the pool at once; Replanning: the day’s lists); docs/plans/four-scales/README.md, 3.4, 3.5, section 4 Q7 Touches: sim/authored (takeBack); sim/steps (takeBack); tests/authored.js Goal: No authored task waits on a holder who cannot work, unless its controller kept it Acceptance criteria:

Noted by the candidate scan of the night of 27 November 2026 (worker section 2).

Decisions: a death hooks through Steps.onGone (steps loads before authored, so its died handler would drop the steps first). A kept step of an ill/away planner stays at risk with risk.why (short 0); a death drops kept steps. Card words: tookBack.why / risk.why. Left undone (unticked): Q7 with the reaper on its own plan (tests/day.js 7 passes as it was); node tools/gate.js run (verify is green 332/332).