VB-1886: Q12 over three seeds: the levelling controller’s windows missed by key and by deadline

Status: done (2026-11-27) Priority: 3 Size: S Arch: plans Phase: implement Design ref: docs/plans/four-scales/README.md, section 4 Q12 Touches: tools/levelled.js Goal: Q12 is judged on enough windows to tell 10% Acceptance criteria:

Noted by VB-1843, 27 November 2026.

Q12 over seeds 7, 11, 42 (populous small, 2 years), windows missed by the five, default 5+2+7 = 14: key arm 16+15+22 = 53 (+279%), deadline arm 9+4+4 = 17 (+21%). All households: default 27+26+48 = 101, key 124, deadline 102 (+1%). By key is far worse; by deadline is within about 20% of the default on the five, 1% on all: not yet shown better or worse than 10%. The by misses of the deadline arm: 9+4+2 = 15 of the 17 (the rest plow misses). Never taken back, none: the default author takes back only a step found at risk at an earlier review and past its by. 7 of 15 were never found at risk (the head’s estimate said on time); 8 were first found at risk after the by (hour 418 to 2074), and the task was gone 4 to 11 hours later. Each was finished within a day of its by, by the head alone (1 hand; one with 0). Cause: the at-risk check runs at the household’s review, which found the shortfall only once the by was past, so the take-back (needs a review before the by day passes) never fired; no rule changed. tools/levelled.js: –detail now also prints the by, the hour first at risk, the take-back and the hour the task was gone (read-only).