village-builder

VB-1868: Routine steps’ left from the tasks they open

Status: done (2026-11-27) Priority: 3 Size: S Design ref: backlog/VB-1826.md Touches: sim/estimate (setLeft) Goal: A routine step’s left from the work it opens Acceptance criteria:

Noted by VB-1826, 27 November 2026.