village-builder

VB-1842: A task at a tile on a pawn’s own plan is dated, at risk and taken back as a task by key

Status: done (2026-11-27) Priority: 3 Size: S Arch: plans Phase: implement Design ref: design.md section 7, Plans at four scales (A step at risk, and the take-back) Touches: sim/authored (weighed, byOf, reviewAuthored); sim/estimate (estimate) Goal: A step its author cannot finish in time is not lost silently, whatever its kind Acceptance criteria:

Noted by VB-1755, 26 November 2026.

Decisions: a goal task is estimated by Estimate.goalEstimate (sum of goalSteps, as agenda goalParts); an undated one waiting on a window (crop to ripen, hay to dry) is dated from that window day, else a harvest was taken back at once. A taken-back goal step leaves once goalGone says so. tests/plan.js tasks that never finish now keep.