Status: done (2026-11-26) Priority: 2 Size: M Arch: plans Phase: implement Design ref: design.md section 7, Plans at four scales (The task as a plan, A load in hand, A stray pile); docs/plans/four-scales/README.md, 3.2 and 3.10; backlog/VB-1749.md Touches: sim/doing (GOODS, unload, VIEW); sim/methods (trip); sim/agents (release, ended); sim/fieldwork (KINDS); sim/meadows (KINDS); sim/carts (KINDS); sim/building (KINDS); sim/chores (KINDS); sim/green (KINDS); sim/exchange (KINDS); sim/droving (KIND); sim/kinds; sim/lying (fetchKind, fetchWork); tests/methods.js Goal: Every task that carries a good goes on from what the world holds after any cut: the kinds VB-1749 left on their phases Acceptance criteria:
leftTimber, leftGrain, leftCart, which go on with VB-1814) The carrying kinds VB-1749 left on their phases declare their methods (sim/methods, sim/doing’s view) and no longer use them: haul (sheaves, stooks set down, again/reload), hay (sim/meadows, sim/carts HAY: cocks set down, again/reload), timber (made at the work, carried to the building site j.dest, not the store: a trip’s haul to a place of the kind’s, not the rule for a load in hand), water and boothwater (the barrel taken at setOut; a cut load spilt, nothing lies), wellstone (sim/green, to the site), manure (carted, no load in hand), and the piles leftTimber, leftGrain, leftCart (found by the stray method of the goal that uses each, not posted).lead and drove (herds led, no pile): declared with mind, or named in the PR as misfits with the reason.npm run verify green and node tools/gate.js --base docs/gate/base.json passing; hungry household-days and deaths by hunger before and after reported, and the counters (node tests/counters.js).Noted by VB-1749, 26 November 2026.
Notes:
sitetimber, to j.dest), boothwater and water (spilt when cut), wellstone, manure (tend, no load).fetched: true: every hay pile, the landing’s and a meadow’s): no goal with methods uses grain or a cart, and the landing’s firewood is not the building’s timber.lead, drove: misfits (herds led, no pile; mind is not carried out by sim/agents’ onward yet), named in the PR.repay.reload.done 0 between work legs) as held: it now
counts made, left and a hand walking with a load as progress (tools/gate.js); the base rerun at 070eedce with it: stuck 0 everywhere, both.