village-builder

VB-180: Wrap-up: state ownership and boundaries

Status: done (2026-11-12) Priority: 3 Size: S Arch: ownership Phase: wrap-up Design ref: none (code structure). VB-172’s map; docs/architecture/stress-tests.md; the review’s stage 6 (docs/architecture/prompt.md, section 8). Goal: Once the boundaries Kim chose are in (VB-173 to VB-179), check the arch as a whole: rerun the map, see what fell, and review the external stress tests against the code. VB-173 to VB-179 are done (7 November 2026), so it is ready. Acceptance criteria: