village-builder

VB-1758: Partial repair: an arriving task is slotted into the day’s lists, and a lost holder’s tasks go back to the pool

Status: done (2026-11-26) Priority: 2 Size: M Arch: plans Phase: implement Design ref: design.md section 7, Plans at four scales (Replanning); The day’s work; docs/plans/four-scales/README.md, 3.5, 3.8 (the saving to show), 3.10 step 5, section 4 Q6 and Q7 Touches: sim/day (slotIn, allot, daysOf, slotArrived, slotOut, lostHolder, allotDays); sim/jobs (post, sweep, refreshJobs, lookForWork); sim/fit (allotted); sim/deaths (dayOfDeath); sim/hands (settle); sim/voice (begin); sim/away (open); src/vb.js; tests/day.js Goal: The allotment absorbs a shock in place, cheaper than allotting the day anew, before the levy takes hours away Acceptance criteria: