Status: done (2026-11-26) Priority: 2 Size: M Arch: plans Phase: implement Design ref: design.md section 7, Plans at four scales (The task as a plan, A load in hand, A stray pile); Finishing what was begun; docs/plans/four-scales/README.md, 3.2 and 3.10 step 3, section 4 Q2; backlog/VB-1548.md Touches: sim/methods; sim/agents (ended, deposit, release, freeHands); sim/days (step, worked); sim/chores (KINDS); sim/building (KINDS); sim/meadows (KINDS); sim/fieldwork (KINDS); sim/drying (KINDS); sim/deer (KIND); sim/dig (KIND); sim/byre (KINDS); sim/droving (KIND); sim/lying (fetchKind, fetchWork); tests/methods.js; tests/days.js Goal: Every task that carries a good goes on from what the world holds after any cut, and no load is left on a pawn whose task let it go Acceptance criteria:
load, carry, carted, stack, a cart taken) declares its methods and no longer uses the phases; the PR lists the kinds converted and those that misfit a method, with the reason (the mocks found herd and spin: mind is the primitive meant for them). Converted (one method, trip): fish, rackfish, gather, hunt, dig, boilsalt, pick, quarry; the rest (haul, hay, timber, water, boothwater, wellstone, manure, leftTimber, leftGrain, leftCart) and the misfits lead and drove (herds led, no pile: mind) are carried by VB-1812.sim/days sends no pawn home itself: a pawn on a day owed whose hours are booked while it carries the creditor’s load hauls it to the creditor’s store by the rule for a load in hand, then goes home; VB-1548’s check on a constructed state passes unchanged, and the stuck tasks of VB-1546’s script are 0 on founders small, seeds 3 and 7, 4 years.docs/plans/four-scales/README.md, 3.10), by one command: npm run verify green (a test that asserted the old behaviour updated on purpose, never skipped or quarantined, and named in the PR), and node tools/gate.js --base <the last recorded result> passing (VB-1774): no settlement extinct by hunger or collapsed (VB-1774’s bound), no more tasks held over 48 hours than the base, the stocks’ unexplained no larger.node tests/counters.js, --update with the entries listed); the result kept (--out) as the next task’s base.trip); their goal is met once its work is done (job.made); a load in hand is agent.loadOf-aware (a pile’s record read by its delivery); no fetch kind is made for them. sim/days emits dayGiven and sim/agents ends the day there (a load in hand first; onward’s dayGiven): it sends nobody home itself.deliver, the unload’s effect), outside (every household holds off its projects: a neighbour’s freed hands cleared the couple a plot), madeatwork (a cut gathering trip’s pile is found by the stray method, no fetch kind), methods (the fuzz counts Q2’s set-downs by cause; one whose carrier could walk on fails).job.made only with a load); madeatwork 3b. Gate again, against 7831a5e1: holds (stuck 1 on populous 11 as the base); hungry household-days populous 48 -> 199, 112 -> 91, 351 -> 324; kept as docs/gate/base.json. The review’s advisories F3, F4, F5, F7 and F2’s rest go to VB-1813.