Status: ready Priority: 3 Size: S Arch: debt Phase: implement Design ref: design.md, Loans, obligations and cases (Grain loans); backlog/VB-312.md Touches: sim/journeys (unfetched); tests/loans.js Goal: A repayment that does not arrive is not paid: grain cut off on its way to the store lies for the store, never back in the debtor’s Acceptance criteria:
sim/journeys unfetched, the haul branch).Noted by VB-312, 25 November 2026.