village-builder

VB-1714: Ways worn over the ice

Status: ready Priority: 3 Size: S Arch: roads Phase: implement Design ref: design.md, Climate and travel beyond walking; docs/plans/VB-190.md 5.2 Touches: src/sim/paths.js (bars); src/draw/paths.js (trail, drawChunk); new tests/icewear.js Goal: VB-083’s winter ways: a way walked over bearing ice shows as trodden snow; today sim/paths counts no wear on water, so there is nothing to draw Acceptance criteria:

Noted by VB-083, 25 November 2026.