village-builder

VB-1701: Followers: the medium runs and the cost on the fixtures

Status: ready Priority: 3 Size: S Design ref: backlog/VB-708.md Touches: tools/followers.js Goal: VB-708’s report and cost measured where it could not be Acceptance criteria: