village-builder

VB-164: Plan: the household’s year: opportunities, plans and tasks (slice 3)

Status: done (2026-11-10) Priority: 2 Size: S Arch: year Phase: plan Design ref: Work: opportunities, plans and tasks (Jobs, owners and roles: under revision); docs/roadmap.md, section 3.3; docs/architecture/target-v2.md, section 4.5 (Plans, Opportunities, Tasks, Eligibility, Work), trace 7.2, and Kim’s decisions 11, 12, 13 and 15. Goal: Jobs are posted today by the things that need doing. In the target they are available (computed from rights and stores, never stored); a plan makes tasks of them (a household’s standing routines and seasonal plans; the village’s routines, set by the meeting afresh each year); and those eligible take them (members, servants, helpers; the hired later). This was the foresight plan (needs, intentions, actions); target-v2 settles its structure, so what is left is the concrete design. Design slice 3 and write its tasks. Acceptance criteria:

Plan (10 November 2026)

Run unattended. Written: docs/review-work.md (the survey with file and function, the design, proposed design.md section 7 text, the cost before building, ten draft tasks and the disposition of the tasks taken over, measurements before) and ten questions in QUESTIONS.md, “VB-164: the household’s year, slice 3’s design”. Criteria 1 to 4 are met; the fifth (“once answered”) waits for Kim, so the status is needs-review. Slice 2’s VB-079 is done, so the older question (may this plan run first) is moot.

Answers and tasks (10 November 2026, the backlog review with Kim)

Kim answered the ten questions in the session (QUESTION_ARCHIVE.md, “VB-164: the household’s year”). Where an answer departs from the proposal: