Status: blocked Waits for: Kim Priority: 2 Size: S Design ref: backlog/VB-1619.md (Evaluation method); tools/review.js eval; docs/agents/usage Goal: The decision whether independent review stays, is narrowed or stops, made on the evidence the method of VB-1619 fixed before the data came in. Acceptance criteria:
tools/review.js, HOLDOUT).node tools/review.js eval run and its output in this file: per arm the tasks done and observed, the escapes (tasks whose Cause: names them, made within 14 days, not opened by their own review) and escapes a task; the ratio, reviewed against control, with its exact 90% interval; median cost and minutes a task; for the reviewed arm the findings by grade, the confirmed catches, the false blockers, the tasks merged with a finding unresolved, the cost a catch and the break-even.node tools/agent-usage.js --history docs/agents/usage).HOLDOUT set to false (or the review removed) by the task that carries the decision out.Cause: line does not see it; an implementer who knows a review comes may work differently (the cost by arm shows it); the replay of 17 to 24 November made 72% of tasks eligible, partly from merges inflating reconstructed diffs.