village-builder

VB-1598: Fair: an offer still open when the fair ends lapses with it

Status: done (2026-11-24) Priority: 2 Size: S Design ref: design.md, The fair; backlog/VB-1584.md Goal: no offer of the fair outlives the loads it was made from Acceptance criteria:

Noted by VB-1584, 24 November 2026.

VB-1598, 24 November 2026: