village-builder

VB-1563: Cost: the routes begun by the planner’s commands

Status: done (2026-11-24) Priority: 2 Size: M Design ref: docs/cost.md, 1.3 (rules 6 and 8); backlog/VB-1554.md (the measure) Goal: The second part of the jobs line (VB-1554’s profile, populous small, seed 7, 2 years): the commands takeDay issues are 22% of it (takeDay 23%, of which the verb work’s run 79%: start 58%, of that walkTo and setOut 41%, findRoute 25%; release 11%), about 1.27 route searches a pawn-day against 1.9 hits. A pawn that takes a task walks from where it stands to the task’s site, and most such walks are between the farm’s door and its own fields, day after day. Acceptance criteria:

Noted by VB-1554, 23 November 2026.

Notes (VB-1563)