village-builder

VB-1561: A hay target met early is kept to the winter

Status: done (2026-11-23) Priority: 2 Size: S Design ref: design.md section 7 (the head’s targets); src/sim/meadows.js hayWanted; tests/head.js (the raised hay target) Goal: With standing duties (VB-1553) the haymaking is done days sooner: the target is met with meadows unmown, their mowing is called off (sim/meadows hayWanted), and the stack falls to 2.67 winters of 3 by the start of winter (tests/head.js; 4.48 before, by the overshoot of meadows mown together). A target met early should still be met at the winter. Acceptance criteria:

Noted by VB-1553, 23 November 2026.

Notes (VB-1561):