village-builder

VB-1475: Refactor: split sim/expansion: the village’s plots, the cottage’s stages, who gets a plot

Status: done (2026-11-23) Priority: 3 Size: M Design ref: none (code structure). AGENTS.md, Conventions (width, VB-415); backlog/VB-1407.md, VB-1411.md, VB-1413.md Goal: sim/expansion went to 16 exports when main’s MAX_PLOTS met the cottage’s exports of VB-1407 and VB-1411 (cottageJob, cottagePlan, cottageTimber, plotTimber). It holds three responsibilities: the village’s plots (the trigger, the site, startPlot, the clearing’s jobs and steps, release); the cottage as stages of a plan, a plot’s and a settler household’s (cottageSteps, cottagePlan, cottageJob, finishCottageStage, roofOn, the timber sites); and the allotment (who is open to a plot, allot, reallot, the heir’s). The plots stay; the cottage’s stages belong with sim/building (the stage kinds and the timber rule are there) or a module of sites; the allotment with the moving round’s askings. Acceptance criteria: