village-builder

VB-1471: Repair the night of 21 November: invariants, fixtures and the invariants band

Status: done (2026-11-25) Priority: 1 Size: S Design ref: docs/gates.md (a red night is repaired by a task of its own) Goal: The extended tier is green again after the run of 21 November (VB-463, VB-1142, VB-1151 and the merge of main up to PR #200). Acceptance criteria:

Notes