village-builder

VB-1313: Fix: the night’s red extended checks of 19 November, second run (fixtures’ ties, the engine bench’s decode, soil)

Status: done (2026-11-19) Priority: 1 Size: S Design ref: docs/gates.md Goal: The extended tier is green again after the second run of 19 November (nightly-2026-11-19b). Acceptance criteria:

Noted by the orchestrator of nightly-2026-11-19b, 19 November 2026.

Notes (VB-1313)