village-builder

VB-123: Project plans: steps, reservations and reconsideration

Status: done (2026-11-12) Priority: 2 Size: M Arch: year Phase: implement Design ref: Economy and jobs (Jobs, owners and roles: Multi-step jobs; Long work and processing: Building jobs). Job review, second pass, 30 Oct 2026. Goal: A project is held in three shapes today: a land project is f.project = {tile, stage, hours} (src/sim/fields.js, src/sim/meadows.js), a plot is village.plots[] (src/sim/expansion.js) and a restoration is f.claim (src/sim/farmclaims.js): each is a plan with steps, each step opening when the one before is done. Make them one: a project plan in st.plans, whose steps reserve what they spend and are reconsidered when they become impossible. The job’s own shapes (go, work, fetch, carry) are left as built until a building needs materials fetched (slice 6). Acceptance criteria: