village-builder

VB-122: The idle report measures waits from when a job is free, and counts switches

Status: done (2026-11-02, 2434d84) Priority: 3 Size: S Arch: tooling Phase: implement Design ref: none. Job review, second pass, 30 Oct 2026 (REVIEW.md, gap 8). Goal: tools/idle.js measures a job’s wait from when it was first posted, so a 20-hour field that is worked over two days counts the night and the second morning as waiting, and a job taken within the hour it was posted is never seen. Work-arch tasks also report job switches (VB-107), which each had to count with its own script. Acceptance criteria: