Status: blocked Waits for: VB-815 Priority: 3 Size: M Arch: roads Phase: implement Design ref: World and scale (River courses: crossing at fords and, later, bridges). Kim, 30 Oct 2026: bridges need construction; the rule (a bridge tile is passable) comes with VB-112, building them later, with resource management. Goal: After VB-112 a river is crossed only at fords, which can mean long detours to a field, a woodlot or the next village. A village should be able to build a bridge where the detour costs it most. Acceptance criteria:
QUESTION_ARCHIVE.md, VB-115) and the principles of 16 November; design.md, Climate and travel beyond walking (Built ways, passage and upkeep); docs/plans/VB-190.md, sections 5.5 and 8.w.crossing becomes 2 when it stands, and the compiled ground reads it.w.wear) and the loads that lacked a way (wayMiss). He puts the best to the meeting if its saving over WAYS.payback 5 years exceeds its hours; Kim’s figure of 200 extra steps a year is the floor below which nothing is proposed. At most one way a village at a time.wayDuty as any built way. An ox cart crosses a bridge and not a ford of a river (VB-810).docs/img/. A constructed check: a village whose fields lie across a river 12 steps from the ford proposes the bridge at the nearer site and builds it, and the route to the fields then crosses it; with the ford beside the fields it proposes nothing; unmended it closes after 16 years.docs/slices.md, section 3.10; the slices Decided by Kim): moved to slice 10, arch roads. blocked until the slice’s plan (VB-190) confirms, rewrites or closes it; its questions in QUESTIONS.md wait for that plan, which may reframe them.docs/plans/VB-190.md, section 8): rewritten, as above. It should wait for VB-815 (built ways as facilities), which the orchestrator sets.