village-builder

VB-107: More urgent work interrupts a job

Status: done (2026-10-30) Priority: 3 Size: M Arch: work Phase: implement Design ref: Economy and jobs (Long work and processing: Multi-day jobs: a job keeps its progress when pawns stop to answer something more urgent). Jobs review, 30 Oct 2026. Goal: A pawn keeps its job until it is done or the work day ends: a farmer hoeing a 20-hour field does not stop when the last firewood runs out or a ripe field waits. VB-022 lets the cook leave other work after 14:00; this task makes that a general rule. Acceptance criteria:

Run Switches per pawn-year Cook calls per pawn-year Hungry household-days Fields sown Crops lost to frost Adults idle, spring / summer / autumn / winter Population at year end
Populous 7, before 0.01 0.73 0 / 380 / 535 425 / 422 / 425 0 / 8 / 2 56% / 73% / 64% / 81% 817 / 851 / 871
Populous 7, after 0.29 0.73 0 / 455 / 524 425 / 421 / 421 1 / 7 / 1 55% / 73% / 64% / 80% 814 / 845 / 844
Populous 42, before 0 0.71 0 / 476 / 438 439 / 438 / 428 2 / 9 / 2 57% / 73% / 65% / 81% 825 / 849 / 852
Populous 42, after 0.32 0.70 0 / 408 / 473 439 / 439 / 436 1 / 8 / 2 56% / 73% / 65% / 81% 830 / 861 / 880
Founders 7, before 0 1.81 0 / 0 / 0 6 / 10 / 10 1 / 0 / 0 41% / 66% / 64% / 75% 9 / 11 / 11
Founders 7, after 0.30 1.47 0 / 0 / 0 6 / 10 / 10 0 / 0 / 0 45% / 67% / 67% / 76% 10 / 13 / 14
Founders 42, before 0 2.04 0 / 11 / 0 7 / 10 / 10 3 / 0 / 0 38% / 66% / 62% / 75% 10 / 10 / 10
Founders 42, after 1.81 2.88 0 / 19 / 0 7 / 10 / 10 3 / 1 / 1 37% / 63% / 61% / 74% 11 / 11 / 10