village-builder

VB-035: Wrap-up: debt and land

Status: blocked Waits for: VB-320, VB-321 Priority: 3 Size: S Arch: debt Phase: wrap-up Design ref: docs/slices.md, section 3.5 (Done when); Land and rights; Households and other bodies; Exchange, Loans, obligations and cases; Claims, ownership and territory; Time and calendar (growth close to 3% a year on open land); Inheritance and expansion (clearing new land is the release valve). Goal: Check slice 5 as a whole against the design with long runs, report its probes against bands and propose tuning. It merges the two older wrap-ups the slice took over: inheritance and expansion (this task’s first form) and claims, ownership and territory (VB-046, closed into it by VB-184). Acceptance criteria: